Port of Oakland Green Power Microgrid
The project started as a full seaport microgrid: a 1 MW solar array, 6.5 MW of battery storage, and about 150 heavy-duty EV chargers, backed by a $41.6M state grant. I sized and modeled the system, worked on Burns' 30-charger share of the design, and helped coordinate the 30/60/90% reviews.
In later iterations the Port narrowed the scope to EV charging alone. That package went out to bid in December 2025 as 115 heavy-duty chargers across five sites.